Installation
Battery unit extension - Panasonic / Sanyo for Powador-gridsave Page
Figure : Fit the xing bracket onto the battery
Key
1 Battery 3 Fixing bracket
2 Fixing screws (M3x10)
Step 1: Fit the battery (batteries)
↻ Preparation complete.
. Fit the xing bracket provided onto the battery using xing screws
(M3x10) at the required torque of 0.78 Nm.
(See Figure on page )
. Insert the battery into the corresponding battery compartment on the
energy storage system in the correct position and pole alignment and
secure using the xing screws (Mx).
» Check the battery(ies).
NOTE
Before starting, check the idle voltages of the batteries.
In individual cases, it may be that the idle voltage (U
LL
) of the indi-
vidual battery modules vary.
The maximum deviation permitted between the individual batteries
is . V !
Comments to this Manuals